INFRASTRUCTURE PROJECTS

INFRASTRUCTURE STEEL PROJECTS - OSMACOM - LRT Egypt New Capital 5
LRT “LIGHT RAILWAY TRAIN”
INFRASTRUCTURE STEEL PROJECTS - OSMACOM - Azha Bridges 7
Azha Bridges
cropped-Logo-Eng-Website-no-backdround-jbg.jpg
Banha-Menouf Bridges
cropped-Logo-Eng-Website-no-backdround-jbg.jpg
Bagoureya Bridges
osmacom , on shore off shore oil & gas services with Petrojet - steel structure and piping services
Saad Atteya 30m span Bridge
INFRASTRUCTURE PROJECTS

LRT “LIGHT RAILWAY TRAIN”

Scope Of Project:

Along with fabricating and erecting 3 steel bridges with total weight of 670 tons, 45 m span, and cross-sections height up to 2.5 meters for the LRT “Light railway train” project, Osmacom for Steel Industries has supplied 2000 meters long of steel handrails.  

The 90-kilometer high-speed rail line will enter passenger service in October 2021, with a capacity of 500,000 commuters per day. It guarantees speedy transportation between Cairo and the new cities (Obour – Mostakbal – Shorouk – New Heliopolis – Badr – Industrial Zone and the 10th of Ramadan – the New Administrative Capital) with a total of 16 stations.

INFRASTRUCTURE PROJECTS

Azha Bridges

Scope Of Project:

Long Span Bridges



INFRASTRUCTURE PROJECTS

Al Fardous Bridge

Scope Of Project:

pedestrian bridge

INFRASTRUCTURE PROJECTS

Banha-Menouf Bridges

Scope Of Project:

Long Span Bridges



INFRASTRUCTURE PROJECTS

Saad Atteya Bridge

Scope Of Project:

 30m span Bridge Design, Fabrication and Erection

INFRASTRUCTURE PROJECTS

Bagoureya Bridges

Scope Of Project:

Long Span Bridges